As part of its ongoing street maintenance program, the City will begin the annual crack seal project next week, weather permitting. Areas are located between Medicine Lake Rd and Hwy 55 (Area 1) and 26th Ave N and Golden Valley Rd (Area 2) in the maps below.
Work includes routing, measuring, cleaning, and sealing cracks in the existing bituminous pavement. Cover material is spread on top of the hot sealant, and blotting material (such as toilet paper) will be used to prevent tracking. There will be no road closures.
Questions? Contact RJ Kakach, assistant city engineer, at 763-593-8043, or email RKakach@goldenvalleymn.gov.

