Siding

Basic permit and inspections requirements for siding in Golden Valley are outlined below.

Permit Requirements

A Building Permit is required for a siding job.

Required Inspections

  • Final inspection

Three Inspections Musts

  1. Post the inspection report card on the job site until the final inspection is completed. Make sure it’s protected from the weather.
  2. Notify Inspections when each phase is ready for inspection.
  3. Schedule all inspections in advance (please have your permit number available). You can reach the Inspections Department between 8 am and 4:30 pm at 763-593-8090.